FPUA WTP Degasifier and Clearwell Improvements

SOW – SUMMARY OF PROJECT

 

The project involves replacing key components of two degasifiers and making structural and coating repairs in the clearwell. Work includes:

  • Replacing four 16-inch butterfly valves (two with electronic limit switches) and six flexible couplings with 316 stainless steel components.
  • Removing and replacing damaged vertical DMP pipe sections and associated link-seals.
  • Replacing stainless steel baffle anchors with FRP epoxy anchors.
  • Repairing up to 500 sq. ft. of interior clearwell coating and recoating the unused pump penetration and pump can sleeve.
  • All hardware will be stainless steel with EPDM gaskets.

 

Engineering services include design drawings, coordination with FPUA, site inspections, and record drawings.
Construction services cover equipment installation, coating repair, schedule management, and site cleanup.

Project Achievements / Benefits
      • Achievements
      • Preliminary and final designs were submitted on time with no client comments.
      • The project was completed on schedule, demonstrating seamless coordination between design and construction teams for smooth execution.
      • Improvements to the water treatment process ensured continuous operation during construction.

 

      • Highlights
      • Replacement of butterfly valves, including electronic limit switches for remote indication of open/closed position.
      • Replacement of pitted vertical stainless steel DPM pipes inside the clearwell with glued joint PVC pipes, including link-seals.
      • Repair of up to 500 sq. ft. of coating inside the clearwell, and preparation and recoating of the unused pump penetration through the top slab.
      • All necessary submittals completed and approved on time.

 

      • Benefits

Replacing aging and corroded components inside and outside the degasifiers' clearwell reduces future maintenance costs and ensures long-term efficient operation

Project Timeframe

0.75 Years

Completed June 2025

Project Cost Estimate

$498,124.35

Client

Keith Stephens

Fort Pierce Utilities Authority

715 S. 25th Street

Fort Pierce, FL 34947

Phone: (772) 466-1600

Expertise