PBC WTP 11 Post Treatment Improvements

Globaltech was tasked with providing operational upgrades to post-treatment chemical pumping equipment at PBCWUD’s Water Treatment Plant No. 11 in Belle Glade, Florida. The existing equipment was aged beyond its usable lifespan.

The improvements included the replacement of the sodium hydroxide, corrosion inhibitor, and anti-scalant dosing systems. Also included were the installation of a new double-wall HDPE tank, stainless steel fabricated membrane process building inlet filters, improvements to a degasifier tower cleaning system, a new Deep Injection Well (DIW) compressor and FRP building, and an anti-scalant transfer station.

New electrical improvements included modifications to existing RIO panels and SCADA logic modifications.

Project Achievements / Benefits
  • Replacement of aged sodium hydroxide, corrosion inhibitor, and anti-scalant dosing systems at PBCWUD WTP 11, and well as other miscellaneous upgrades.
  • These design enhancements improve safety and compliance, ensuring all modifications meet current regulations, codes, and permitting requirements.
Project Timeframe

3 Years

Completed in 2024

Project Cost Estimate

$4,550,780.04

Client

Palm Beach Water Utilities Department

8100 Forest Hill Blvd.,

West Palm Beach, FL 33413

Phone: (561) 493-6000

Expertise

Post Treatment