• 901 Yamato Rd
  • Suite 220
  • Boca Raton , FL 33487

News & Events

Lift Station Generator Replacement

November 01, 2019

An emergency generator at Seacoast Utility Authority (SUA) Lift Station 54 was reaching the end of its useful life.Under a continuing design-build services contract, SUA hired Globaltech to create engineering plans and replace the generator and its diesel fuel tank with new equipment of equal size.

Power Improvements

The existing 300-kilowatt emergency back-up generator and main switchboard inside Generator Building No. 1 at the Western Regional Wastewater Treatment Facility (WRWWTF) had both surpassed their reliable life spans and needed to be replaced. Under a continuing design-build contract, Palm Beach Count

Read More
[contact-form-7 id="5" title="Contact Us"]