Lift Station Improvements
Under a continuing design-build contract with Seacoast Utility Authority (SUA), Globaltech upgraded more than a dozen lift stations between 2015 and 2018, incorporating the latest SUA standards for functionality, reliability, and aesthetics. Globaltech prepared engineering drawings, provided electri