Gravity Thickener Mechanism Replacement
The rake arm mechanism inside the lime sludge gravity thickener tank at the Fort Pierce Utilities Authority (FPUA) water treatment plant (WTP) became inoperable and needed to be replaced. FPUA hired Globaltech under a continuing design-build services contract to replace the mechanism and implement s