Elevated Water Tank

The elevated water storage tank for the Town of Mangonia Park was aging and deteriorated. Under a consent order issued by the Palm Beach County Health Department, the County’s Water Utilities Department contracted with Globaltech to replace the aging tank.

As a design-build company, Globaltech permitted, designed, constructed and commissioned the tank removal and replacement with assistance from subcontractor Pittsburg Tank.

The project scope included a hydraulic evaluation of the distribution system, including flow and pressure testing and recommendations for interconnect use while the elevated tank was out of service.

Project Achievements / Benefits

  • Work included constructing a new steel bowl on the ground at the site, removing the existing bowl, installing the new bowl on the existing leg-supports, and then blasting and coating. The work was done in this manner in order to meet the strict schedule of the consent order.
  • The project also included installation of an on-line chlorine residual analyzer, replacement of several valves, and replacement of the level indicator.
  • Work under this contract followed the requirements of the Davis-Bacon Fair Labor Act, as it was funded with a Community Development Block Grant.
  • Project was completed in 7 months.