As the Design-Builder and Consultant, we optimized the performance of the sodium hypochlorite system. Our scope included upgrading chemical process piping, bulk storage tanks, and pumps, alongside comprehensive electrical, instrumentation, and control system enhancements at the ECRWRF Reclaimed Water Facility.
Key project highlights include decommissioning on-site 0.8% strength sodium hypochlorite generators, and installing a new sodium hypochlorite bulk storage and injection system to use 12% strength sodium hypochlorite.
Project Achievements / Benefits
- Improve the redundancy and reliability of the reclaimed water treatment process and enhance safety for the operations and maintenance personnel at Palm Beach County Water Utilities Department.
- The project secured the required DEP permits and met PBCWUD standards, ensuring compliance. Detailed mechanical and electrical designs optimized system functionality and safety. It was completed on schedule with the owner’s coordination between the design, permitting, and construction teams.
Project Timeframe
1 Years 8 months
Completed in 2025
Vendors
Hillers Electrical Engineering, Inc.
WGI, Inc.
Pacifica Engineering Services, LLC
Apex Welding Services Corp
Energy Efficient Electric, Inc.
Total Safety Training & Consultants LLC
Brown & Phillips, Inc.
Project Cost Estimate
$4,441,139.00.