PBC East Central Regional Water Reclamation Facility Reclaimed Water Facility Improvements – Phase 3

As the Design-Builder and Consultant, we optimized the performance of the sodium hypochlorite system. Our scope included upgrading chemical process piping, bulk storage tanks, and pumps, alongside comprehensive electrical, instrumentation, and control system enhancements at the ECRWRF Reclaimed Water Facility.

Key project highlights include decommissioning on-site 0.8% strength sodium hypochlorite generators, and installing a new sodium hypochlorite bulk storage and injection system to use 12% strength sodium hypochlorite.

Project Achievements / Benefits
  • Improve the redundancy and reliability of the reclaimed water treatment process and enhance safety for the operations and maintenance personnel at Palm Beach County Water Utilities Department.
  • The project secured the required DEP permits and met PBCWUD standards, ensuring compliance. Detailed mechanical and electrical  designs optimized system functionality and safety. It was completed on schedule with the owner’s coordination between the design, permitting, and construction teams.
Project Timeframe

1 Years 8 months

Completed in 2025

Vendors

Hillers Electrical Engineering, Inc.

WGI, Inc.

Pacifica Engineering Services, LLC

Apex Welding Services Corp

Energy Efficient Electric, Inc.

Total Safety Training & Consultants LLC

Brown & Phillips, Inc.

Project Cost Estimate

$4,441,139.00.

Client

Palm Beach Water

Utilities Department

8100 Forest Hill Blvd.,

West Palm Beach, FL 33413

Phone: (561) 493-6000

Expertise

Pumps