SUA LS 118 Improvements

As the Design-Builder and Consultant, we completed the LS 118 Improvements project, upgrading the mechanical, electrical, and civil infrastructure. Our work included installing a new 12-inch flow meter assembly, bypass piping, pump disconnects, a manual transfer switch with generator connection, and replacing valves and piping with 316SS components. We managed permitting, site coordination, and regulatory compliance and delivered final documentation via Procore for project closeout.

Project Achievements / Benefits
  • Key project highlights include installing a new above-ground flow meter, upgrading electrical systems with a manual transfer switch, and replacing existing valves to improve access to maintenance areas.
  • The LS 118 Improvements boost system performance by enhancing reliability and minimizing downtime. The upgraded infrastructure reduces maintenance costs and enhances safety for operators and staff. Compliance with current SUA standards ensures long-term operational efficiency and regulatory compliance.

  • The project secured the required permits and met SUA standards, ensuring compliance. Detailed mechanical, electrical, and civil designs optimized system functionality and safety. It was completed on schedule with smooth coordination between the design, permitting, and construction teams, ensuring seamless execution.

Project Timeframe

2 Years

Completed in 2023

Project Cost Estimate

$604,078.34

Client

Seacoast Utility Authority

11500 RCA Center Drive.

Palm Beach Gardens, Florida 33410

Phone: (561) 627-2900

Expertise

Power Generation, Pumps