Wellfield Improvement Program

The Fort Pierce Utilities Authority (FPUA) maintains multiple raw water supply wellfields located throughout its service area and operates a combination of both surficial and Floridan aquifer wells connected by a network of raw water mains. In a continuing effort to improve the reliability and quantity of raw water supply to its water treatment facility, FPUA in 2005 began a series of well improvement and replacement projects.

Through the course of several consecutive design-build contracts, Globaltech has provided a full suite of services to FPUA as the Prime Design-Build contractor for wellfield improvements.

Project Achievements / Benefits

  • Hydrogeological evaluation of existing wells for improvement strategies
  • Site study and design for new replacement wells
  • Raw water system network modeling for proper pump selection and design
  • Complete wellhead design and construction
  • Aquifer performance testing (APT) for well location and capacity analysis
  • Installation of new wells including drilling services and well testing
  • Power, SCADA, and control panel replacements and new construction
  • Full permitting services involving:
    • Building Department
    • FDEP (including sanitary survey)
    • SFWMD
  • Pump/column pipe installation and startup/testing services
  • Well abandonment and plugging
Ready to Work With Us?

Thinking of a future design build project? Trying to find the right technical group to help with your capital improvements? We’d be happy to answer any questions.